|
Categories
|
Information
|
Featured Product
|
|
|
 |
|
There are currently no product reviews.
 ;
A very well written and easy to understand manual.
 ;
There was no problem at all.After paying i had to wait only a few hours,than i could
download the manual in best pdf-quality.
Thank You !
 ;
I found this service manual to be complete in every detail except for troubleshooting charts. It would be helpful if it had a set of troubleshooting charts; however it is a very good manual otherwise and for the price it is very well worth it.
 ;
Complete manual included schematics layouts and alignment procedure, clear to read and magnify, extremely pleased with manual and owner manual . com's service
 ;
perfect, i am very satisfait for the réception of the sansui r-5l service manual, thank you very much
COMPONENTS
MAIN FUSE
TEST PROCEDURE
Check for continuity of the fuse with an multi-meter.
RESULTS
Normal Abnormal
NOTE: If the fuse is blown, check the primary, the secondary, and the monitor switches, H.V.D. and H.V.C. before replacing the fuse. If the fuse is blown by improper switch operation replace the defective switch and the fuse at the same time. Replace just the fuse if the switches operate normally.
5-11
|
|
 |
> |
|
|
Parse Time: 0.18 - Number of Queries: 125 - Query Time: 0.044